Posted: Mon Dec 28, 2009 2:03 pm
The bench is undergoing some winter upgrades - be a shame to test V8 heads without it being a full eight cylinder bench so its got its full complement of motors now.


I have also improved the sealing of the motor box by adding a steel framework and will also add some bracing to the motor box.

I have also made a head mounting fixture - the tube is a bit big at the moment - diameter is 104mm - ideally the bore diameter needs to be withing 1mm of the actual - but a quick search of e-bay and I have found some 100mm OD 3mm wall clear Acrylic tubing - 94mm bore
- and cheap enough for a metre of the stuff delivered as well.
Just waiting for the local nut and bolt supplier to open up so that I can get hold of the right fasteners to put it all together again.
Andrew


I have also improved the sealing of the motor box by adding a steel framework and will also add some bracing to the motor box.

I have also made a head mounting fixture - the tube is a bit big at the moment - diameter is 104mm - ideally the bore diameter needs to be withing 1mm of the actual - but a quick search of e-bay and I have found some 100mm OD 3mm wall clear Acrylic tubing - 94mm bore

Just waiting for the local nut and bolt supplier to open up so that I can get hold of the right fasteners to put it all together again.
Andrew