Posted: Tue Aug 26, 2008 9:47 am
So, is running an engine unloaded ok for bedding in a new cam alone?
I am currently building up the block Pete/Sidecar kindly donated, this has done 5000 miles with the crank and pistons as fitted but i will be using a new cam. Ideally i want to be able to run it (and therefore run it in) before i fit it into the vehicle as i will be taking the car off the road to do the swap.
I dont really want to take a week off only to find the engine doesnt want to play.
How crucial is getting it to 2000rpm right away? Am thinking if timing is not quite right etc and need to stop to tweak things.
Sorry to hijack- but thought it wasnt really worthy of its own thread...
I am currently building up the block Pete/Sidecar kindly donated, this has done 5000 miles with the crank and pistons as fitted but i will be using a new cam. Ideally i want to be able to run it (and therefore run it in) before i fit it into the vehicle as i will be taking the car off the road to do the swap.
I dont really want to take a week off only to find the engine doesnt want to play.

How crucial is getting it to 2000rpm right away? Am thinking if timing is not quite right etc and need to stop to tweak things.
Sorry to hijack- but thought it wasnt really worthy of its own thread...